Discussion on Quality Defect of Sinking Pipe Piles
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.14

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    对河南省焦作某校区工程振动沉管灌注桩桩身缺陷原因进行了分析,并提出了相关的预防措施。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:June 03,2004
  • Adopted:
  • Online:
  • Published:
Article QR Code