Bored Pile Tech. in Wenzhou World Trade Center
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.14

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main peculiarities, the engineering difficulties, and the chief technical countermeasures of bored pile drilling for Wenzhou World Trade Center were introduced. The relative treatments and points for attention to drill deep pile hole in intermediary weathering remain rock body were also mentioned.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 14,2004
  • Revised:September 14,2004
  • Adopted:
  • Online:
  • Published:
Article QR Code