Volume , Issue 5, 2002
>29-30
Online First
PDF
HTML
XML
Export
Cite reminder
Mud Performance Requirement for the Drilled Pile with Mud-protecting Wall
DOI:
CSTR:
[cstr]
Author:
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
TU473.1
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by
|
Materials
|
Comments
Abstract:
Key words:
建筑桩基技术规范,灌注桩,泥浆护壁,泥浆性能
Reference
Related
[1]
王安德.
Mud Performance Requirement for the Drilled Pile with Mud-protecting Wall
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2002(5):29-30.
[2]
Huang Guangming.
Influence of Directional Drilling Mud Performance on Stability of the Hole Wall
[J].岩土钻凿工程,2008(3):8-11.
[3]
谭现锋,朱学顺.
Application of Wet Rotary Drilling Using Static Mud for Wall Protection
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(12):22-23.
[4]
Steve J. Hodgetts,Brendan C. O’Kelly,Matthew J. Raybould.
Stabilisation of the Stanton Lees Landslip Using an Embedded Pile Retaining Wall
[J].Geotechnical and Geological Engineering,2007,25(6):705-715.
[5]
LIN Li-jin.
Application of High Quality Mud in Wall Protection for Rotary Bored Pile Engineering
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013(11):57-60,80.
[6]
Chen Xiaoming.
Post Pressuregrouting Technique for the Bored Pile Completed with the Borehole Wall Protected by Mud and the Estimating Method of Vertical Bearing Capacity of Single Pile
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1999(3):17-20.
[7]
Wang Bo.
Mechanism and Application of Post Grouting for Bored Pile in Slurry Wall
[J].Shanghai Land & Resource,2009(2):34-40.
[8]
ZHANG Xin-ming,ZHENG Xiu-hu,YU Jin-yang and BAI Chen-guang.
Discussion of Evaluation on Mud Rheological Property Used for Bored Pile
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013,40(4):75-77.
[9]
HAO Yan-zhou.
Analysis on Anti-sloughing Mud Properties in the Pile Foundation Borehole Construction
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2014,41(3):59-62.
[10]
HUANG Zhen-guo.
Mud Technology for Bottom-enlarged Grouting Pile Construction of MGM Grand Macao
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2012,39(5):56-60.
[11]
JING Long,LI Wei,CUI Guo-shu,LIU Chao and CHANG Lin-zhen.
Wall Protection Technology with Saltwater Mud in Borehole CY-1
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013,40(6):48-52.
[12]
WONG Ke-sheng,JIANG Tong-sheng and HAN Yin-long.
Discussion of Construction Technology for Leakage Formations Treatment with Aerated Mud and Foam Mud
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2017,44(3):21-26.
[13]
Mohamed I. Ramadan,Ebraheem H. Ramadan,Marwan M. Khashila.
Cantilever Contiguous Pile Wall for Supporting Excavation in Clay
[J].Geotechnical and Geological Engineering,2018,36(3):1545-1558.
[14]
YAO Ai-guo.
A NewDesign Method of Anchored Sheet Pile Wall for Excavation
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2000(5):33-34,37.
[15]
LI Xiao-qing.
Analysis of the Wall Protection Fumction of Mud in Trenching Operations/
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2001(4):21-23.
[16]
ZHAI Dong-xu.
Comparison of Wall Protection with Casing and Mud for Medium-depth Hole Drilling in Thick Overburden Layer in the East of Henan
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013,40(8):6-9,17.
[17]
WU Ji-xiu,SHANG Yu-hu,LI Xin-miao and XUE Qian-bing.
Analysis on Rock Physical and Mechanical Properties and the Mud Stability Technology for Borehole Wall in Qiangtang Basin
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2018,45(3):9-13.
[18]
DENG Guang-qing.
Application of Mud in Pile Foundation Project for Compartment Buildings in Guangzhou
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(2):48-49.
[19]
XIAO Feng-wei,ZHENG Xiao-liang,LI Chao,DAI Hong-zhuan,LIAO Xi-wen and GAO Zhi-jian.
Mud and Wall Protection Technologies Applied in the Complex Formation of a Large Gold Mine
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2014,41(2):29-32.
[20]
ZHANG Lian-shun and LI Quan-fu.
Practice of Mud Purification and Recycling in Cut-off Wall Construction for Guanzhou Hydropower Station
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2015,42(7):78-80.
Cited by
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Share
0
Article Metrics
Abstract:
920
PDF:
677
HTML:
191
Cited by:
0
History
Received:
Revised:
December 27,2001
Adopted:
Online:
Published:
September 25,2002
Article QR Code