4/23/2025, 9:07:02 AM 星期三
Home
About Journal
Business News
Editorial Board
Instruction for Author
Contents Download
Academic Forum
Ethics Statement
Contact Us
中文
Home
>
Archive
>
Volume , Issue 1, 2002
>47-48
Online First
PDF
HTML
XML
Export
Cite reminder
Technical Analysis on the Side Tracking Under Adverse Conditions in Deep Section of FN-1 Well
DOI:
CSTR:
[cstr]
Author:
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
TE243
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by [0]
|
Materials
|
Comments
Abstract:
Key words:
油田探井
;
粘卡
;
侧钻技术
;
“落鱼”事故
;
定向钻进
Reference
Related
[1]
胡茂中,鄢泰宁.
Technical Analysis on the Side Tracking Under Adverse Conditions in Deep Section of FN-1 Well
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2002(1):47-48.
[2]
刘永贵,罗桂秋,宋瑞宏,姜玉芳,李欢欢.
Analysis on the Factors Affecting Drilling Velocity in Deep Exploratory Well in Xujiaweizi
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(7):56-58.
[3]
Zhan Lan.
Side Tracking Technique in Directional Well
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1994(5):38-41.
[4]
LI Zhi-wen and YIN Kun.
Protection on PHC Pile and Analysis on Stability of Side Slope in Deep Excavation Engineering
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(10):39-41.
[5]
程增福.
Side Tracking Used for the Stuck Incident in GUANG-2 Well
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2001(5):44-44,61.
[6]
DONG Qiu-sheng,HUANG Xian-long,LANG Zhen-hai and YANG Zhong-yan.
Technical Analysis on Transforming Abandoned Oil Well into Geothermal Well
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2016,43(6):18-21.
[7]
WEI Bi-bo.
Analysis on the Influence of Well Completion Drilling Technologies to Water Output and the Technical Measures
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013,40(1):31-34.
[8]
Cui Dongliang,Li Xibing,Ye Zhouyuan.
Development on the Analysis of Rockburst Under Unloading Conditions and Its Prospect
[J].Geotechnical Engineering Technique,2006,20(3):154-158.
[9]
DU Xu,ZHANG Xi-kun,WANG Jian-xing and XU Liu-wan.
Heat Balance Analysis on Dynamic Parallel Connection of Deep Well Drilling Rig
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2011,38(3):50-53.
[10]
SU Zhou,ZHANG Shaohe,WANG Wenbin,CAO Han,LIU Leilei,XIAO Jincheng,HE Hongsheng and GUO Jun.
Technical difficulties in drilling of Well Qianshuidi-1 and their solutions
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2021,48(5):54-59.
[11]
GU Yi,XU Jian-hua and XU Shu.
An Analysis on Measures to Increase Discharge of Grand Canyon Deep Geothermal Well
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(6):49-52.
[12]
Zhang Yan.
Strength Analysis of Drill Collar Connection in Deep Well Drilling
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1998(5):21-25.
[13]
MA Shu-pan and ZHANG Yan-ming.
Application of Oil-in-water Drilling Fluid in Unbalanced Drilling Section of Well Lishen 1
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2009,36(10):18-20.
[14]
KONG Fan-jun,YANG Zhi-guang,ZHANG Shu-rui,LIU Yong-gui and HAN Fu-bin.
Test Research on Combined Drilling Techniques under Conditions of High Temperature and Deep Well in Xujiaweizi
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(11):51-53.
[15]
LIU Qing-wen and CHE Can-hui.
Design of Deep Excavation Dewatering Under Complex Geological Conditions of Yangtze River Floodplain
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013,40(5):54-59.
[16]
HE Ji-bin,PAN De-yuan,LI Bing-ping and YE Cheng-ming.
Deep Well Stratified Vacuum Pumping Test and the Mechanism Analysis
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2017,44(1):18-23.
[17]
Zhu,Binzhong,Fan,Junqi,Shi,Xiaoyan,Liu,Pengfei,Guo,Jiaqi.
Study on Rockburst Proneness of Deep Tunnel Under Different Geo-Stress Conditions Based on DEM
[J].Geotechnical and Geological Engineering,2022,40(3):1373-1386.
[18]
Ren,Ming-yang,Zhang, Qian-yong,Zhang, Long-yun,Wang, Wang-sheng.
Experimental Study on Rock-Support Interaction in Deep Tunnel Under Complex Geological Conditions
[J].Geotechnical and Geological Engineering,2021,39(5):3761-3783.
[19]
F. Huang,X. L. Yang,T. H. Ling.
Prediction of Collapsing Region Above Deep Spherical Cavity Roof Under Axis-Symmetrical Conditions
[J].Rock Mechanics and Rock Engineering,2014,47(4):1511-1516.
[20]
CHEN Ye-peng.
Difficulties of Drilling Speed Increasing for Deep Well in Complex Geological Conditions
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2018,45(7):10-13.
Cited by
[1]
CHEN Liqiang,YANG Xucai,WANG Zan and WANG Zhanling.
Economic analysis for offshore well fishing and sidetracking scheme
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2019,46(5):39-43,64.
[2]
李锁成,谷玉堂,奚广春,孙念,邢广宇.
新120-侧平80井侧钻钻井实践
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2010(2):20-23.
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Share
0
Article Metrics
Abstract:
939
PDF:
321
HTML:
186
Cited by:
0
History
Received:
May 23,2001
Revised:
May 23,2001
Adopted:
Online:
Published:
Article QR Code