Balanced Drilling Process with Foam Mud
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Considering the severe circulation loss during drilling in water well with the deep water table, the feasibility of application of balanced drilling with foam mud of extra low density to water well drilling with the deep water table is proposed. The foam mud balanced drilling principle and process are discussed. The application of the process in water well drilling in Qian County, Shanxi is briefly introduced.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 12,2001
  • Revised:December 12,2001
  • Adopted:
  • Online:
  • Published:
Article QR Code