Multi-process for Combined Foundation Construction
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Some multi processes newly developed are described with their uses, which includes drilled expanded compaction piling, rammed naturally graded stone column with simultaneous heavy hammer casing, drilled back fill mixed slurry piling, and drilled expanded piling with simultaneous casing.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:July 15,2000
  • Adopted:
  • Online:
  • Published: September 25,2000
Article QR Code