Research on the Process of Enhancing Baring Capacity of Bored-piles
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.11

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In light of the characteristics of bored piles, the processes of improving the bearing capacity of boredpiles are summarized in this paper. The results of piles' tests in situ show that piles' performance are improved by toe pressuregrouting, this paper illustrates that the toe pressure postgrouting can be used both as a routing construction method, and as a reliable remedial measure.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:January 25,1999
  • Adopted:
  • Online:
  • Published: January 25,2000
Article QR Code