Abstract:This paper introduces the design and application method of a new simplified steel lining device that applied in tunnel of smaller ratio of height and width This device designed by authors uses lifting mechanisms separately and can be replaced by outer screw jack for satisfying the condition of excavating and lining in a tunnel at the same time The device had been successfully applied in a road tunnel in Zhuji City