Drilling Technology and Construction Practice of the Deep Bored Pile of Yangzi Bridge in Baishazhou, Wuhan
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U445.551

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction method, equipment and bore hole wall protection technology of the 100m long bored pile are described, with the analysis on the feasibility of suction reverse circulation method, balled bit problem in seriously weathered layer and technical measures for solving the problem presented

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: May 25,1998
Article QR Code