Measures for Preventing The Bored Pile Hole from Enlarging and Caving
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU753

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to ensure the pile foundation construction quality and reduce concreting cost, a variety of measures have been taken to prevent the borehole from enlarging and caving with focus on the related preventative measures and techno-economic benefits.