Dry Auger Bored Piles in Bouldery Formation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU753

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The equipment, drilling tools, drilling process and technical features of the dry auger boring method are described with reference to the field cases. When used to install large diameter bored piles in bouldery formation, the method exhibits fully such technical advantage as high hole completion efficiency, good quality, little environmental pollution and is an advance of the domestic pile foundation drilling technology.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: January 25,1997
Article QR Code