Concrete Seepage Cut-off Wall Construction for a River-crossing Dam
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TV698.233

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The seepage cut -off wall for the river-crossing dam is usually installed in the sand and the sandy gravel. The dam site treatment depends on the geological conditions and the construction methods include trench-cutting without pilot hole, trench-cutting with pilot hole, percussive trenching, rotsry trenching and trenching by trench saw. The trench saw provides a new construction method for the new seepage cut-off walling material, but has its limitation.