Method of Designing Bored Pile Walls for Deep Foundation Pit Retaining
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.14

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Bored piles braced together by anchorsto constuct the retaining wall is one of the main methods applied in deep foundation pit retaining supportfor high-rise buildings. The design method of anchor-braced bored piles is described with reference to thedeep fondation pit retaining support for Yantai Longjing Building.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: May 25,1996
Article QR Code