山西省地质勘查局,山西 太原 030001
P634;TE24
抢装方箱闸板时,吊车将方箱伸入吊至井台内支撑钢板上方,随后将Ø340 mm套管剩余20 mm的连接距离完全割透,抢险队员立即用气动扳手安装固定方箱(见图5)。然后左右两侧连接放喷管线。
Shanxi Provincial Geological Prospecting Bureau,Taiyuan Shanxi 030001, China
王平,师鹏峰.大同地区干热岩勘查高温高压自喷井综合治理工艺[J].钻探工程,2021,48(S1):258-263.WANG Ping, SHI Pengfeng. Comprehensive treatment technology for high temperature and high pressure blowing wells in hot dry rock exploration in Datong[J]. Drilling Engineering, 2021,48(S1):258-263.