中铁十四局集团大盾构工程有限公司,江苏 南京 211800
TU46+3
China Railway 14th Bureau Group Shield Engineering Co., Ltd., Nanjing Jiangsu 211800, China
李福林.基于抽水试验的深基坑降水方案优化调整与实施[J].钻探工程,2021,48(11):104-111.LI Fulin. Optimized adjustment and implementation of deep foundation pit dewatering based on pumping test[J]. Drilling Engineering, 2021,48(11):104-111.
复制