后压浆技术在孟加拉国灌注桩施工中的应用
CSTR:
作者:
作者单位:

河北建设勘察研究院有限公司,河北 石家庄050031

中图分类号:

TU473.1+4


Application of the post grouting process in Bangladesh bored pile construction
Author:
Affiliation:

Hebei Construction Survey and Research Institute Co., Ltd., Shijiazhuang Hebei 050031, China

  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献 [17]
  • |
  • 相似文献 [20]
  • | | |
  • 文章评论
    摘要:

    孟加拉国某新建燃煤电厂项目所处场地属于海相沉积地层,桩基工程采用钻孔灌注桩。为了解决孟加拉国新的施工工况带来的新的施工问题,按照中国的工程建设标准进行施工,并采用旋挖钻孔灌注桩后压浆施工技术,很好地解决了钻孔沉渣和桩侧泥皮对基桩承载力的影响,提高了基桩承载力,试验检测结果表明,达到了Ⅰ类桩的标准。通过后压浆技术在本项目的成功应用,总结出现场操作控制措施,为“一带一路”国家钻孔灌注桩后压浆施工技术提供借鉴经验。

    Abstract:

    The new coal-fired power plant project in Bangladesh is located in marine sedimentary strata, and bored piles are used for the pile foundation. In order to solve the construction problems brought about by the new construction conditions in Bangladesh, the construction was carried out according to the construction standards of China, and rotary drilling bored piles with post grouting were adopted to eliminate the influence of drilling settlements and mud cake around the piles on the bearing capacity of foundation piles; thus improving the bearing capacity of foundation piles. The test results showed that the piles met the Class I standard. Through the successful application of post grouting technology in this project, the field operation control measures are summarized, which can provide reference for bored pile post grouting construction technology in “the Belt and Road” countries.

    参考文献
    [1] 肖坚,赵刚.后压浆提高钻孔灌注桩承载力的试验研究[J].岩土工程技术,2011,25(1):10-12,16.XIAO Jian, ZHAO Gang. Experimental study on bearing capacity of bored pile using post-grouting technology[J]. Geotechnical Engineering Technique, 2011,25(1):10-12,16.
    [2] 冯定波.桩端后压浆对提高钻孔灌注桩承载力的作用机理分析[J].中外建筑,2009(6):198-199.FENG Dingbo. Analysis on the mechanism of post-grouting pile to improve the bearing capacity of bored piles[J]. Chinese and Overseas Architecture, 2009(6):198-199
    [3] ACI543R—Design, manufacture, and installation of concrete piles[S].
    [4] 胡云鑫,张时斌,袁江川.后压浆技术国内研究现状分析[J].北方交通,2018(8):22-25.HU Yunxin, ZHANG Shibin,YUAN Jiangchuan. Analysis on the research status of post-grouting technology in China[J]. Northern Communications, 2018(8):22-25.
    [5] JGJ 94—2008,建筑桩基技术规范[S].JGJ 94—2008, Technical code for building pile foundation[S].
    [6] 张慧.后压浆灌注桩在天津超高层建筑基础中的应用分析[J].探矿工程(岩土钻掘工程),2018,45(3):84-86.ZHANG Hui. Application analysis on post grouting pile in super high-rise building foundation of Tianjin[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2018,45(3):84-86.
    [7] 王德武,张辉义.杭州滨江区钻孔灌注桩桩端后压浆施工实践[J].探矿工程(岩土钻掘工程),2009,36(12):54-56.WANG Dewu, ZHANG Huiyi. Construction practice of bored cast-in-place pile post grouting in Hangzhou[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2009,36(12):54-56.
    [8] 胡胜华,张所邦,韩朝,等.灌注桩后压浆技术的工程实践[J].探矿工程(岩土钻掘工程),2014,41(12):71-74.HU Shenghua, ZHANG Suobang, HAN Chao, et al. Engineering practice of post-grouting in cast-in-situ pile[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2014,41(12):71-74.
    [9] 张淑娟,李洪厂.中钢天津响螺湾工程后压浆钻孔灌注桩施工技术[J].探矿工程(岩土钻掘工程),2014,41(3):68-72,79.ZHANG Shujuan, LI Hongchang. Construction technology of post-grouting bored pile for Xiangluowan project of Sinosteel in Tianjin[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2014,41(3):68-72,79.
    [10] 彭仕奇.桩底后压浆浆液扩散问题研究[J].探矿工程(岩土钻掘工程),2013,40(6):73-76.PENG Shiqi. Study on grout diffusion of pile-bottom post grouting[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2013,40(6):73-76.
    [11] 陈飞,陈雄志.旋挖钻进工艺在钻孔灌注桩后压浆工程中的应用[J].探矿工程(岩土钻掘工程),2012,39(12):57-59.CHEN Fei,CHEN Xiongzhi. Application of rotary drilling in post pressure grouting of bored grouting pile[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2012,39(12):57-59.
    [12] 李友东,杨生彬,邵卫信.后压浆钻孔灌注桩施工技术[J].探矿工程(岩土钻掘工程),2008,35(4):49-52.LI Youdong, YANG Shengbin, SHAO Weixin . Construction technology of post-grouting cast-in-place pile[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2008,35(4):49-52.
    [13] 彭仕奇.苏通大桥超长桩桩底后压浆试验及效果[J].探矿工程(岩土钻掘工程),2011,38(11):54-58.PENG Shiqi. Test of pile bottom post grouting for super long pile in Sutong Bridge and the effect[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2011,38(11):54-58.
    [14] 丁伟,王伟,聂庆科,等.中美印关于桩基静载试验检测标准应用对比研究[J].河北水利电力学院学报,2020,30(1):30-33,73.DING Wei, WANG Wei, NIE Qingke, et al. Comparative research on the testing standards application of static load test for pile foundation among China, America and India[J]. Journal of Hebei University of Water Resources and Electric Engineeging, 2020,30(1):30-33,73.
    [15] ASTM D 1143—07, Standard test methods for deep foundations under static axial compressive load[S].
    [16] Bangladesh national building code—2010[S].
    [17] ASTM D 4945—00, Standard test method for high-strain dynamic testing of piles[S].
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

黄玉辉,丁伟,赵晓磊,等.后压浆技术在孟加拉国灌注桩施工中的应用[J].钻探工程,2021,48(5):119-124.
HUANG Yuhui, DING Wei, ZHAO Xiaolei, et al. Application of the post grouting process in Bangladesh bored pile construction[J]. Drilling Engineering, 2021,48(5):119-124.

复制
分享
文章指标
  • 点击次数:626
  • 下载次数: 870
  • HTML阅读次数: 1080
  • 引用次数: 0
历史
  • 收稿日期:2020-07-02
  • 最后修改日期:2021-04-15
  • 录用日期:2021-02-01
  • 在线发布日期: 2021-05-14
  • 出版日期: 2021-05-10
文章二维码