Abstract:The floating work platform is greatly affected by weather, wave, tide and other natural factors; thus, construction needs to be done according to the weather window period. It is not suitable for projects with the tight construction period, long operation period and high technical requirements. The jack-up platform designed in this papernot only has the advantages of floating working platforms, refitted barges and other construction platforms, but also has the self-elevation function by which the deck can leave the sea level to avoid the influence of meteorologicaland environmental factors to the greatest extent, effectively extend the construction window period, and improve work efficiency during the construction period; at the same time, the stable marine work platform greatly improves the accuracy of data parameter acquisition.