塔里木盆地柯坪地区新苏地1井冲洗液护壁堵漏工艺
DOI:
CSTR:
作者:
作者单位:

1.山东省第三地质矿产勘查院,山东 烟台 264003; 2.中国地质调查局油气资源调查中心,北京 100083; 3.中国石油大学〈北京〉地球科学学院,北京 102249

作者简介:

通讯作者:

中图分类号:

P634.6

基金项目:

中国地质调查局地质调查项目“新疆重点区块油气基础地质调查”(编号:DD20189602)


Wall protection and leak-plugging with drilling fluid for Well Xinsudi-1 in Keping Area of Tarim Basin
Author:
Affiliation:

1.No.3 Exploration Institute of Geology and Mineral Resources in Shandong Province, Yantai Shandong 264004, China; 2.Oil and Gas Survey, CGS, Beijing 100083, China; 3.College of Geosciences, China University of Petroleum 〈Beijing〉, Beijing 102249, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    塔里木盆地柯坪地区地质调查井钻探工程项目新苏地1井,位于塔里木盆地阿瓦提凹陷沙井子构造带上,该构造带地层倾角大、胶结性差、破碎严重,井壁稳定性差。钻遇地层岩性主要为泥岩、砂岩、泥质粉砂岩、灰岩、白云岩、含泥云岩、石英片岩等,存在多处垮塌和漏失井段。现场采用聚合物防塌冲洗液体系,较好地解决了地层破碎、坍塌掉块等复杂问题,该体系具有抑制性强、胶结性好,在整井的施工中取得了较好的护壁堵漏应用效果,保证了项目的顺利实施。

    Abstract:

    The geological survey drilling project in the Keping area of the Tarim Basin-Well Xinsudi1 is located on the Shajingzi tectonic belt of the Awati depression in the Tarim Basin. The structural belt is featured of a large inclination, poor cementation, serious breakage and the stability of the borehole wall is poor. The lithology encountered during drilling was mainly mudstone, sandstone, argillaceous siltstone, limestone, dolomite, mud-bearing dolomitic rock, quartz schist and so on. There were many collapses and circulation loss. Use of the polymer anti-collapse drilling fluid system on the site has solved the complex problems such as broken formation, collapse, falling stones. The system provided strong inhibition and good cementation, and achieved good performance in borehole wall protection leakage plugging, ensuring successful implementation of the project.

    参考文献
    相似文献
    引证文献
引用本文

董海燕,高永进,白忠凯,等.塔里木盆地柯坪地区新苏地1井冲洗液护壁堵漏工艺[J].钻探工程,2019,46(8):47-55.
DONG Haiyan, GAO Yongjin, BAI Zhongkai, et al. Wall protection and leak-plugging with drilling fluid for Well Xinsudi-1 in Keping Area of Tarim Basin[J]. Drilling Engineering, 2019,46(8):47-55.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2019-05-16
  • 最后修改日期:2019-07-03
  • 录用日期:2019-07-08
  • 在线发布日期: 2019-08-23
  • 出版日期:
文章二维码