卵漂石地层深基坑高压旋喷桩止水帷幕施工工艺
DOI:
CSTR:
作者:
作者单位:

甘肃工程地质研究院,甘肃地质工程有限责任公司

作者简介:

通讯作者:

中图分类号:

TU473

基金项目:

甘肃省地矿局地质工程类新技术推广项目“深基坑止水帷幕施工技术研究”(编号:201402)


Construction Technology of High Pressure Jet Grouting Pile Waterproof Curtain for Deep Foundation Pit in Cobble and Boulder Strata
Author:
Affiliation:

Gansu Institute Engineering Geology,Gansu Geo-engineering Corporation Ltd.

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合青海省微电机厂棚户区改造项目深基坑止水帷幕施工的成功经验,总结出卵漂石地层深基坑双排单重管高压旋喷桩止水帷幕施工的施工工艺及技术要点。

    Abstract:

    Combined with the successful experience in waterproof curtain construction of deep foundation pit for shantytowns reconstruction of a micro motor factory in Qinghai Province, the summarization is made on the construction technology and the key technical points of double-row single pipe and high pressure jet grouting pile waterproof curtain for deep foundation pit in cobble stratum.

    参考文献
    相似文献
    引证文献
引用本文

鲁鸿福,王丽梅.卵漂石地层深基坑高压旋喷桩止水帷幕施工工艺[J].钻探工程,2015,42(8):80-84.
LU Hong-fu, WANG Li-mei. Construction Technology of High Pressure Jet Grouting Pile Waterproof Curtain for Deep Foundation Pit in Cobble and Boulder Strata[J]. Drilling Engineering, 2015,42(8):80-84.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2015-05-18
  • 最后修改日期:2015-07-16
  • 录用日期:2015-08-05
  • 在线发布日期: 2015-09-07
  • 出版日期:
文章二维码