唐山市第一眼蓟县系地热井钻探及成井技术
DOI:
CSTR:
作者:
作者单位:

河北省地矿局第二地质大队,河北省地矿局第二地质大队,河北省地矿局第二地质大队,河北省地矿局第二地质大队

作者简介:

通讯作者:

中图分类号:

基金项目:


Drilling and Completion Technology in the First Geothermal Well Construction in Jixian System in Tangshan
Author:
Affiliation:

No.2 Geological Brigade, Hebei Bureau of Geology and Mineral Exploration,No.2 Geological Brigade, Hebei Bureau of Geology and Mineral Exploration,No.2 Geological Brigade, Hebei Bureau of Geology and Mineral Exploration,No.2 Geological Brigade, Hebei Bureau of Geology and Mineral Exploration

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    唐山市丰南区ZK1地热井终孔深度3204.8 m,成井深度较深,揭露地层情况较为复杂,采用“四开”井身结构。施工过程中,根据钻遇地层情况的变化,及时调整钻具组合及钻进、钻井液等参数,降低了由于地层变化较大而产生漏浆、掉块、井壁垮塌等造成埋钻、卡钻的施工风险,保证了孔内钻探施工安全及成井质量,为唐山地区相同或此类地层的地热井勘探施工提供了成功经验。

    Abstract:

    The termination depth of ZK1 geothermal well in Tangshan is 3204.8m with “four section” well structure, the revealed formations are complicated. In the construction process, according to the different formations encountered, the BHA and the parameters of drilling and drilling fluid were adjusted timely to reduce the construction risks of drill rod burying and sticking caused by mud leakage, block falling and wall collapse due to large formation changes; the safety and quality of well drilling and completion construction were ensured. This project provides successful experience for geothermal well construction in the same or similar formations in Tangshan area.

    参考文献
    相似文献
    引证文献
引用本文

于孝民,杨春光,董国明,等.唐山市第一眼蓟县系地热井钻探及成井技术[J].钻探工程,2014,41(2):41-44.
YU Xiao-min, YANG Chun-guang, DONG Guo-ming, et al. Drilling and Completion Technology in the First Geothermal Well Construction in Jixian System in Tangshan[J]. Drilling Engineering, 2014,41(2):41-44.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2013-08-28
  • 最后修改日期:2013-02-12
  • 录用日期:2013-12-10
  • 在线发布日期: 2014-02-26
  • 出版日期:
文章二维码