特大型泥石流地质灾害治理工程
DOI:
CSTR:
作者:
作者单位:

广西桂林市国土资源局,广西桂林水文工程地质勘察院,广西桂林水文工程地质勘察院

作者简介:

通讯作者:

中图分类号:

P642.23

基金项目:


Serious Geological Disaster of Debris Flow Control Engineering
Author:
Affiliation:

The Guilin Bureau of Land and Resources,Guangxi Guilin Geotechnical Institute of Hydrogeology and Engineering Geology,Guangxi Guilin Geotechnical Institute of Hydrogeology and Engineering Geology

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合桂林市龙胜县龙胜镇浸沟特大型泥石流地质灾害治理工程实例,探讨在泥石流地质灾害治理工程中采用拦栅坝拦截天然物源及修建坡面排水沟+导流堤+格构式锚定板挡土墙加固堆积区的工程设计,为今后在泥石流地质灾害治理工程中提供参考。

    Abstract:

    Combined with a case of the serious geological disaster control engineering in Longsheng of Guilin, the paper discusses the engineering design of gating dam for natural property reception and slope drainage ditch diversion dike lattice anchor-plate retaining wall for accumulation area consolidation, which could be the reference to the debris flow control works.

    参考文献
    相似文献
    引证文献
引用本文

梁柱,陈燕,陈宏伟.特大型泥石流地质灾害治理工程[J].钻探工程,2013,40(8):70-74.
LIANG Zhu, CHEN Yan, CHEN Hong-wei. Serious Geological Disaster of Debris Flow Control Engineering[J]. Drilling Engineering, 2013,40(8):70-74.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2013-03-28
  • 最后修改日期:2013-03-28
  • 录用日期:2013-07-03
  • 在线发布日期: 2013-09-05
  • 出版日期:
文章二维码