    摘要:

    WFSD-3孔是汶川地震科学钻探项目的系列钻孔之一,历经2年多的施工,攻克了世界罕见的复杂地层钻进、大直径原状样取心和高地应力下钻孔护壁重重技术难关,圆满完成了施工任务。重点介绍了WFSD-3孔施工技术与经验,并对施工若干技术问题提出探讨与认识。

    Abstract:

    The WFSD-3 hole is one of the series of boreholes of Wenchuan earthquake fault scientific drilling project. During 2 years’ construction, many technical challenges, such as drilling in complex strata, large diameter undisturbed core sampling and borehole wall protecting under high geo-stress were overcome. This article especially focused on the construction technology and experience of the WFSD-3 hole and discussed some technical problems.

    参考文献
    相似文献
    引证文献
引用本文

朱恒银,朱永宜,张文生,等.汶川地震断裂带科学钻探项目WFSD-3孔施工技术与体会[J].钻探工程,2012,39(9):12-17.
ZHU Heng-yin, ZHU Yong-yi, ZHANG Wen-sheng, et al. Construction Technology and Experience of WFSD-3 Hole of Wenchuan Earthquake Fault Scientific Drilling Project[J]. Drilling Engineering, 2012,39(9):12-17.