As gravity dam, dual-axis mixing pile process is mainly used in the small-scale and shallow foundation pit. This paper presents an engineering case, in which the large-scale foundation pit is near river, subway and residential districts, but dual-axis mixing pile gravity dam has been successfully applied. The design checking calculation and construction process are introduced.
参考文献
相似文献
引证文献
引用本文
江建华.双轴搅拌桩重力坝在大面积基坑中的应用[J].钻探工程,2012,39(12):54-56,59.JIANG Jian-hua. Application of Dual-axis Mixing Pile Gravity Dam in Large-scale Foundation Pit[J]. Drilling Engineering, 2012,39(12):54-56,59.