Practice of Crack Treatment in Gravity Arch Dam of Nam Ngum 5 Hydropower Station of Laos
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对老挝Nam Ngum 5水电站重力拱坝裂缝进行的灌浆处理,采用化学灌浆和水泥灌浆相结合,取得了良好的治理效果。详细介绍了裂缝深度的检测方法和裂缝止裂措施,以及灌浆施工工艺。

    Abstract:

    Good effect was received by combining chemical and cement grouting treatment for gravity arch dam of Nam Ngum 5 hydropower station of Laos. Crack depth detection and cementation measurements were detailed as well as grouting construction technology.

    参考文献
    相似文献
    引证文献
引用本文

王玉溪,宋平,张连顺,等.老挝Nam Ngum 5水电站重力拱坝裂缝处理实践[J].钻探工程,2012,39(6):68-71.
WANG Yu-xi, SONG Ping, ZHANG Lian-shun, et al. Practice of Crack Treatment in Gravity Arch Dam of Nam Ngum 5 Hydropower Station of Laos[J]. Drilling Engineering, 2012,39(6):68-71.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-05-24
  • 最后修改日期:2012-05-24
  • 录用日期:2012-06-05
  • 在线发布日期: 2012-06-29
  • 出版日期:
文章二维码