According to the consolidation grouting construction for diversion wall in Dongsheng hydropower station, the paper summarizes the principles and precautions of drilling, crack flushing, water pressure test, pulping, grouting and sealing in the process of consolidation grouting. Coagulation and string slurry plugging were taken to deal with slurry leakage and string slurry in the process of grouting construction with good grouting effect.
参考文献
相似文献
引证文献
引用本文
刘卫卫,姜鹏飞,纪晓宇,等.东升水电站导流墙固结灌浆施工工艺[J].钻探工程,2012,39(9):71-74.LIU Wei-wei, JIANG Peng-fei, JI Xiao-yu, et al. Consolidation Grouting Construction Technology for Diversion Wall in Dongsheng Hydropower Station[J]. Drilling Engineering, 2012,39(9):71-74.