Accidents happen a lot in excavation engineering because some key processes, such as anchoring boring, grouting, tension and draining hole, are not strictly controlled. Based on the analysis on the influencing factors of excavation instability and according to the stratum distribution characters in Changsha, introduction was made in the problems easily neglected in excavation construction and preliminary analysis was made on the feasibility and necessity of waterproof curtain. The paper summed up construction technology of pressure cycle grouting of anchor cable in aquifer.
参考文献
相似文献
引证文献
引用本文
陈亮晶,陈晓知,易武博,等.基坑失稳分析及施工中若干问题的思考[J].钻探工程,2012,39(5):61-64.CHEN Liang-jing, CHEN Xiao-zhi, YI Wu-bo, et al. Analysis on Foundation Excavation Instability and Some Problems in Construction[J]. Drilling Engineering, 2012,39(5):61-64.