某深基坑支护设计方案实施过程中的优化
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.2

基金项目:


Optimization in Design Scheme Implementation Process of a Deep Foundation Pit Supporting
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过徐州锦绣大厦深基坑开挖过程中的变形情况,分析该工程基坑变形的根本原因,及时对设计方案进行了合理的优化,有效地限制了基坑的变形,不仅保证了基坑周边建筑物的安全,还节约了造价、方便了施工、缩短了工期。

    Abstract:

    According to the deformation in a deep foundation pit excavation process, analysis was made on the basic cause of engineering foundation pit deformation; the reasonable optimizations were timely implemented on the original design scheme with effective limits to the deformation of foundation pit with the safety ensuring on surrounding buildings of the foundation pit, cost saving, convenient construction and short construction period.

    参考文献
    相似文献
    引证文献
引用本文

杜文宇,郭行.某深基坑支护设计方案实施过程中的优化[J].钻探工程,2012,39(7):67-70.
DU Weng-yu, GUO Hang. Optimization in Design Scheme Implementation Process of a Deep Foundation Pit Supporting[J]. Drilling Engineering, 2012,39(7):67-70.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-02-16
  • 最后修改日期:2012-05-27
  • 录用日期:2012-06-18
  • 在线发布日期: 2012-07-30
  • 出版日期:
文章二维码