According to the deformation in a deep foundation pit excavation process, analysis was made on the basic cause of engineering foundation pit deformation; the reasonable optimizations were timely implemented on the original design scheme with effective limits to the deformation of foundation pit with the safety ensuring on surrounding buildings of the foundation pit, cost saving, convenient construction and short construction period.