With the example of YR-3 well, the paper discussed the multilevel well completion structure and cementing technology of drilling for geothermal water in underlying limestone-dolomite complete formation of Niutuozhen geothermal field. With this technology, borehole collapsing caused by circulation loss and cementing difficulties due to low equipment capacity can be effectively solved. Construction of several wells proved that it is a successful and effective method for Niutuozhen geothermal field and the similar ones.
参考文献
相似文献
引证文献
引用本文
刘文新,张长茂,鲍洪智,等. YR-3井井身井管结构设计及固井技术[J].钻探工程,2012,39(6):35-38.LIU Wen-xin, ZHANG Chang-mao, BAO Hong-zhi, et al. Design of Casing Program for YR-3 Well and the Cementing Technique[J]. Drilling Engineering, 2012,39(6):35-38.