Based on the case of shield segment precast for Nanjing Changjiang tunnel, the precast technique of large diameter shield segment was introduced, and the control measures for precast production technique of high intensity and high permeability-resistance segment were summed up.
参考文献
相似文献
引证文献
引用本文
代洪波,赵誉.南京长江隧道盾构管片预制生产技术研究[J].钻探工程,2012,39(1):80-84.DAI Hong-bo, ZHAO Yu. Production Technique Research on Shield Segment Precast for Nanjing Changjiang River Tunnel[J]. Drilling Engineering, 2012,39(1):80-84.