The paper mainly introduced the drilling technical difficulties in ZK7924 hole of surrounding mining area of Makeng and the successful construction; described the flushing fluid, wall protection and leakage control, the correlating technical parameters and the calculation methods of water exchange amount of cement slurry.
参考文献
相似文献
引证文献
引用本文
彭金灶.马坑外围矿区ZK7924孔施工难点及对策[J].钻探工程,2011,38(9):10-12,15.PENG Jin-zao. Construction Difficulties in ZK7924 Hole of Surrounding Mining Area of Makeng[J]. Drilling Engineering, 2011,38(9):10-12,15.