Abstract:The collapsing, water inflow, leakage, karst cave, old cave and hole shrinking are often encountered in Fujian coalmine field drilling, the drilling quality, efficiency and construction cost were seriously affected. By the long term study on drilling practice, a set of drilling technical process was formed for Fujian coalmine field. Some common problems and treatment measures of Fujian coalmine field drilling were summed up.