强夯法处理某变电站红砂岩填土地基的试验研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU472

基金项目:


Experiment Study on Dynamic Compaction Treatment to Red Sandstone Fill Foundation in a Substation
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过对某变电站红砂岩填土地基的强夯试验研究,验证了强夯设计参数,为基础设计提供了依据,并对红砂岩地区采用强夯地基处理技术进行了探讨,供类似工程的设计、施工及检测借鉴参考。

    Abstract:

    The dynamic compaction design parameters were verified by the study on dynamic compaction test of red sandstone fill foundation in a substation, which provided the basis to foundation design. And the study was also made on dynamic compaction treatment applied in red sandstone area, which can be reference to design, construction and test of similar projects.

    参考文献
    相似文献
    引证文献
引用本文

黄兴怀,方玉友,吴志海.强夯法处理某变电站红砂岩填土地基的试验研究[J].钻探工程,2012,39(3):47-50.
HUANG Xing-huai, FANG Yu-you, WU Zhi-hai. Experiment Study on Dynamic Compaction Treatment to Red Sandstone Fill Foundation in a Substation[J]. Drilling Engineering, 2012,39(3):47-50.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-08-31
  • 最后修改日期:2011-08-31
  • 录用日期:2011-12-25
  • 在线发布日期: 2012-03-19
  • 出版日期:
文章二维码