Due to the changes of subgrade in the operating environment, the changes of physical and mechanical properties of the fill were caused, displacement and deformation happened in the retaining wall. On the basis of analysis on deformation, joint reinforcement of pre-stressed anchor cable and anti-sliding pile was proposed with good effect. The paper introduced the design of reinforcement scheme and the construction technology of pre-stressed anchor cable for anti-sliding pile.
参考文献
相似文献
引证文献
引用本文
王洪庆,严译强,马健.云阳县滨江大道路基挡土墙变形分析与加固[J].钻探工程,2012,39(2):70-73.WANG Hong-qing, YAN yi-qiang, MA Jian. Analysis on Retaining Wall Deformation in Binjiang Road of Yunyang County and Reinforcement[J]. Drilling Engineering, 2012,39(2):70-73.