In this paper, analysis was made on the causes of drill pipe sticking accident of SR-28 geothermal well by collapsing. According to the different causes, casing mill, measuring sticking point and breaking pack of dynamite and other technical means were adopted, the accident was successfully treated.
参考文献
相似文献
引证文献
引用本文
李振杰,徐云鹏,王平,等. SR-28地热井坍塌卡钻事故的处理[J].钻探工程,2011,38(9):49-51.Li Zhen-jie, Xu Yun-peng, WANG Ping, et al. Treatment of Drill Pipe Sticking in SR-28 Geothermal Well Collapsing Accident[J]. Drilling Engineering, 2011,38(9):49-51.