This article analyzed the major risks and serious consequences in the large slurry shield construction of Nanjing Yangzte River tunnel under the complicated geotechnical and hydrological conditions. The engineering risks were evaluated and summed up by experts and professional engineers with prevention measures. The emergency countermeasures were formulated to reduce and prevent the major safety and quality accidents.
参考文献
相似文献
引证文献
引用本文
张智博.南京长江隧道大型泥水盾构施工风险分析及对策[J].钻探工程,2011,38(6):65-69.ZHANG Zhi-bo. Risks Analysis on Large Slurry Shield Tunnel Construction in Nanjing Yangtze River Tunnel and the Countermeasures[J]. Drilling Engineering, 2011,38(6):65-69.