The mud property is largely adjusted before the hole termination in coalfield drilling, the stability of hole wall was destructed by the changed mud property, which leads to fractured rock falling and logging tube blocking; and improper treatment would make the accident even more complicated. The causes of blocking were analyzed with the treatment experience and lessons.
参考文献
相似文献
引证文献
引用本文
胥刚.一起测井仪遇卡孔内事故的处理与教训[J].钻探工程,2012,39(1):50-52.XU Gang. Treatment of Downhole Accident of Logging Tool Blocking and the Lesson[J]. Drilling Engineering, 2012,39(1):50-52.