The paper briefly analyzed the hydrogeology conditions and water inrushing factors, and the water-proof plan was established. The division of grouting section, slurry matching ratio in the water-proof grouting procedure and grouting ending standard were discussed.
参考文献
相似文献
引证文献
引用本文
王强.常德青峰煤矿地面钻孔注浆堵水实践[J].钻探工程,2011,38(10):63-65.WANG Qiang. Grouting for Water-proof of Surface Drilling in Qingfeng Coalmine of Changde[J]. Drilling Engineering, 2011,38(10):63-65.