Nitrogion foam under-balanced drilling test was made to effectively release gas reservoir and evaluate the technical and economic feasibility of under-balanced horizontal well in developing He 1 gas reservoir of Daniude gas field, whole process under-balanced was realized to protect the gas reservoir with higher penetration rate than common horizontal well drilling. It provides the technical reserve for the development of Daniudi low permeability gas field.
参考文献
相似文献
引证文献
引用本文
陈晓华,邓红琳,闫吉曾,等.泡沫钻井在大牛地气田盒1气层的应用[J].钻探工程,2011,38(10):19-23.CHEN Xiao-hua, DENG Hong-lin, YAN Ji-zen, et al. Application of Foam Drilling in He 1 Gas Layer of Daniudi Gas Field[J]. Drilling Engineering, 2011,38(10):19-23.