静观ZK1号地热井的施工及开发利用计划
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Construction of Jingguan ZK1 Geothermal Well and Development & Utilization Plan
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了静观ZK1号地热井施工概况和设备机具选择,简述了分层钻进措施:采用“三开两固”成井,各次钻具配套,泥浆性能指标,固井工艺措施及抽水试验方法。经测定其井口水温63.5 ℃,由于其井口自流量仅为421.9 m3/d,不便于下一步开发利用,拟定在距原井700 m处再施工一定向井,并提出了定向井的初步设计方案。

    Abstract:

    This paper introduces the machinery and equipment for geothermal well construction, and describes the stratification drilling measures: 3-section and 2-cementing for well completion, drilling tool matching, mud property, well cementing and pumping test. It was unfavorable for further development and utilization with wellhead water temperature of 63.5 ℃ and flowing yield only 421.9 m3/d. Another directional well was planed to construct 700 m away from the original well; and the design scheme was put forward.

    参考文献
    相似文献
    引证文献
引用本文

任良治,田正权,邝光升,等.静观ZK1号地热井的施工及开发利用计划[J].钻探工程,2010,37(10):48-50.
REN Liang-zhi, TIAN Zheng-quan, KUANG Guang-sheng, et al. Construction of Jingguan ZK1 Geothermal Well and Development & Utilization Plan[J]. Drilling Engineering, 2010,37(10):48-50.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-09-10
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: 2010-10-25
文章二维码