Combined with the engineering example, analysis is made on the reasons for pile breaking in CFG pile construction technology, technical parameters and cutting pile technology. And the broken pile treatment measures by pile extension and grouting are proposed.
彭第,潘殿琦,张海云. CFG桩断桩分析与处理措施探讨[J].钻探工程,2011,38(5):49-52. PENG Di, PAN Dian-qi, ZHANG Hai-yun. Analysis and Discussion on Treatment of CFG Broken Pile[J]. Drilling Engineering, 2011,38(5):49-52.