The paper summarized the construction technology of uranium ore exploration in deep Shazijiang deposit and its peripheral ones in Guangxi. Difficulties of block-falling, borehole collapsing, short service life of diamond bit, wearing of drilling pipe & the joint and the borehole bending were solved in granite stratum drilling. The valuable experience was accumulated for granite stratum drilling.
参考文献
相似文献
引证文献
引用本文
刘海斌.广西沙子江矿床深部及外围铀矿普查钻探施工技术[J].钻探工程,2011,38(4):25-27.LIU Hai-bin. Drilling Construction Technology of Uranium Ore Exploration in Deep Shazijiang Deposit and Its Peripheral Ones[J]. Drilling Engineering, 2011,38(4):25-27.