CBM multiple-lateral horizontal well is a coalbed modification technique combined with well drilling, completion and stimulation, which has great development in China in the past years. According to the development situation of CBM multiple-lateral horizontal well in China, the paper discusses the technical difficulties and key technologies and presents some conclusions.
参考文献
相似文献
引证文献
引用本文
刘志强,胡汉月,史兵言,等.煤层气多分支水平井技术探讨[J].钻探工程,2011,38(6):6-9.LIU Zhi-qiang, HU Han-yue, SHI Bing-yan, et al. Technology of CBM Multiple-lateral Horizontal Well[J]. Drilling Engineering, 2011,38(6):6-9.