土耳其贝帕扎里采集卤钻井三期工程井组布置的优化设计
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634.7

基金项目:


Design Optimization of Well Unite Layout at Beypazari Trona Solution Mining Project (Phase Ⅲ)
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    土耳其贝帕扎里采集卤钻井三期工程的井组布置设计是在一、二期矿区内利用部分现有井场、现有采集卤管线的基础上,采用了更加优化的三井井组、五井井组、双通道平行井组及复杂井组。此设计减少了投资、缩短了基建周期、便于生产管理,使资源得到更合理的开发利用,增大了矿区现有产能,更大满足了加工厂对卤水的需要。全矿区共布置15个溶采单元,共包括25个井组采矿通道,垂直井29口,水平井23口。

    Abstract:

    Based on the existing well groups and production pipelines, the Phase III well layout of Beypazari trona solution mining project fully makes use of the existing conditions. The Phase III well groups consist of several kinds of optimized well units, such as three-well units, five-well units, side parallel well units and some other complicated well units. Phase III design can highly improve the production of mining project and meet the demands of brine output in trona plant with the advantages of lower investment, shorter construction period and easier management. Totally 15 leaching units with 25 leaching passages are designed and distributed in the mining area of Phase III.

    参考文献
    相似文献
    引证文献
引用本文

刘海翔,刘汪威,陈剑垚,等.土耳其贝帕扎里采集卤钻井三期工程井组布置的优化设计[J].钻探工程,2010,37(11):9-11.
LIU Hai-xiang, LIU Wang-wei, CHEN Jian-yao, et al. Design Optimization of Well Unite Layout at Beypazari Trona Solution Mining Project (Phase Ⅲ)[J]. Drilling Engineering, 2010,37(11):9-11.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-09-14
  • 最后修改日期:2010-09-14
  • 录用日期:2010-11-01
  • 在线发布日期: 2010-11-24
  • 出版日期: 2010-11-25
文章二维码