Description is made of the vibration reduction blasting technique and the excavation method, as well as the use of construction measurement and vibration velocity monitoring in tunnel excavation in respect of the engineering characteristics and excavation difficulty of the Zhantuo road tunnel.
参考文献
相似文献
引证文献
引用本文
李丽邦.玉环干江栈头公路隧道的爆破开挖技术[J].钻探工程,2011,38(2):67-70.LI Li-bang. Construction of Zhantou Road Tunnel with Blasting and Excavation[J]. Drilling Engineering, 2011,38(2):67-70.