Gas pumping-exhaust by drilling construction technology in coalmine is one of the effective ways to reduce the safety risk and the prevention to potential risk in coalmine safety production, the pumping-exhaust well by drilling is an economical and quick way for coalmine safety with very important significance.
参考文献
相似文献
引证文献
引用本文
杜贵亭.超大口径瓦斯抽排放井施工技术[J].钻探工程,2010,37(12):46-50.DU Gui-ting. Construction Technology of Super Large Diameter Gas Pumping-exhaust Well[J]. Drilling Engineering, 2010,37(12):46-50.