Based on the drilling construction in Yaozhuang coalmine of Henan, treatment measures for downhole water gushing, well cementing, coring and hard formation drilling were detailed for future drilling construction.
参考文献
相似文献
引证文献
引用本文
祁新堂,贾永祥.河南省郏县姚庄煤矿普查钻探施工措施[J].钻探工程,2010,37(8):32-34.QI Xin-tang, JIA Yong-xiang. Survey Drilling Construction Measures in a Coalmine of Henan[J]. Drilling Engineering, 2010,37(8):32-34.