    摘要:

    采用强夯法、真空预压排水固结法、动力排水固结法对洞庭湖区一场地进行了加固处理,通过对处理后场地各项参数指标的对比研究,得出动力排水固结法处理软粘土地基是行之有效的方法,达到了预期的效果。此种软基处理方案既经济又合理,同时又满足了施工工期要求,可为类似工程提供有价值的参考。

    Abstract:

    Heavy tamping, consolidation by vacuum preloading drainage and dynamic drainage consolidation were used to reinforce the soft ground in Dongting Lake area. Based on the comparative study on various treated site parameter indexes, dynamic drainage consolidation method was found to be an effective method to deal with the soft clay foundation with the desired effects. The soft ground treatment program is economical and reasonable which can meet the demands of construction schedules at the same time.

    参考文献
    相似文献
    引证文献
引用本文

隆威,程盼,赵娟,等.洞庭湖区软土地基加固处理方案对比研究[J].钻探工程,2010,37(9):46-49.
LONG Wei, CHENG Pan, ZHAO Juan, et al. Comparative Study on Reinforcing Soft Soil Treatment Program in Dongtion Lake Area[J]. Drilling Engineering, 2010,37(9):46-49.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-03-16
  • 最后修改日期:2010-03-16
  • 录用日期:2010-06-21
  • 在线发布日期: 2010-09-09
  • 出版日期: 2010-09-25
文章二维码