Based on the engineering case of sliding treatment with gravity anti-sliding retaining wall reinforced by vertical pre-stressed anchor, the paper described the vertical pre-stressed anchor, anti-sliding retaining wall structure and the construction technological process. Application prospect of this new structure was shown in sliding treatment in bedrock mountain area.