The paper introduced the application of SYZX96/75 wire-line coring hydro-hammer in complex formation with interbedding of soft and hard rocks in a gold mine of Hunan and summed up the construction experience. SYZX96/75 wireline coring hydrohammer was applied with the footage greatly increased and auxiliary time reduced, which played a key role in improving the coring effect in broken formation and reduced hole deviation.
参考文献
相似文献
引证文献
引用本文
蒋光旭,唐振华,李德波,等. SYZX96/75绳索取心液动锤钻具的应用效果[J].钻探工程,2010,37(6):13-15,19.JIANG Guang-xu, TANG Zhen-hua, LI De-bo, et al. Application Effect of SYZX96/75 Wire-line Coring Hydro-hammer[J]. Drilling Engineering, 2010,37(6):13-15,19.