Drilling pipe sticking accident occurred in HDR29D geothermal well, which was overcome by the accident cause analysis, stuck-releasing scheme study and stuck-pipe freeing agent compounding. The paper summed up the causes of drilling pipe sticking in directional well and the treatment method.
参考文献
相似文献
引证文献
引用本文
李振杰,徐云鹏.定向井处理粘吸卡钻事故的技术方法[J].钻探工程,2010,37(6):24-27.LI Zhen-jie, XUN Yun-peng. Treatment Technology for Drilling Pipe Sticking Accident in Directional Well[J]. Drilling Engineering, 2010,37(6):24-27.